* All Passengers returning from any international & domestic travel are required to self-quarantine for fourteen (14) days. Read More

Procurement

    

The following forms are available for downloading in PDF format.


 Sign up to be notified of new procurement opportunities at Green Airport.


Below is a listing of current bid opportunities:

Date
Number
Description
06/09/2020
  
IFB 30305

IFB 30305 A1

Runway 16-34 Reconstruction
T. F. Green Airport
Addendum No. 1
Virtual Pre-Bid Meeting: Wednesday, May 27, 10:00AM
Badge Application Due for Site Visit by: Tuesday, May 26, 10:00AM
Site Visit: Thursday, May 28, 10:00AM - Attendees to report to Maintenance Facility, 300 Airport Road, Warwick, RI
                                            

06/12/2020


IFB 30622
Project Manual
Drawings 
Repair & Preventative Maintenance of Airport Parking Garages
Project Manual
Drawings 
06/16/2020 
RFQ 30534
 
On-Call Airport Rescue Fire Fighting (ARFF) Services
COMING SOON!  T. F. Green Airport  

Terminal Restrooms Renovation
           
Virtual Preliminary Pre-Bid Meeting - May 21, 2020 at 1:30PM

Progress Documents dated 05/18/2020

The Rhode Island Airport Corporation is in the process of designing updates to the public restrooms within the terminal building at T.F. Green Airport, Warwick, Rhode Island.  The project shall include complete demolition and reconstruction of five groups of men’s and women’s restrooms.  Three of the groups are within the secured area – two in the north concourse and one in the south concourse.  Two of the groups are located in the non-secure area of terminal – one on the ticketing level and one on the baggage claim level.  The general scope for each of the restrooms will consist of complete demolition and reconstruction. The reconstruction will be a complete refurbishing to include all new walls, floors, and ceiling finishes, plumbing fixtures, electrical, lighting, power and fire alarm devices, and mechanical systems.  The project also includes the addition of six ADA/adult changing restrooms and four lactation rooms located in near proximity to the existing restrooms. It is anticipated that the project will be implemented in three phases to ensure customer service is maintained.  The project will be advertised for bid on or about May 18, 2020 and the design will be ongoing through June 1, 2020.  Multiple design submissions will be issued through June 1, 2020.  Bids will be due on or about June 12, 2020.

*No questions for this project will be accepted until a formal solicitation is posted.



Below is a listing of bid abstracts:

Date
Number
Description

05/20/20
05/14/20
05/14/20
04/21/20
02/28/20
02/05/20
12/20/19
10/21/19
10/11/19
10/11/19
10/10/19
10/04/19
10/04/19
09/25/19
09/20/19
09/17/19
09/03/19
08/20/19
08/16/19
08/13/19
08/02/19
07/08/19
09/03/19
06/13/19
06/13/19
05/01/19
02/27/19
02/19/19
02/02/19
01/23/19
01/18/19
01/15/19
12/07/18
11/16/18
11/06/18
11/02/18
10/22/18
10/17/18
10/16/18

IFB 26345
IFB 30580
IFB 30581
IFB 30503
IFB 30031
IFB 30032
IFB 29780R
IFB 29781
IFB 29883
IFB 29852
IFB 29844
IFB 29779
IFB 29831R
IFB 29882
IFB 29832
IFB 29699
IFB 27801RR
IFB 29633
IFB 29467
IFB 29365
IFB 29463
IFB 29416
IFB 27801RR
IFB 29314
IFB 29071
IFB 27116
IFB 29010
IFB 28946
IFB 28706
IFB 28665
IFB 28784
IFB 28814
IFB 28629
IFB 28411
IFB 28654
IFB 27800    
IFB 28569
IFB 28641
IFB 28547

Reconstruct Aircraft Parking Ramp and Rehabilitate Taxiway B-PENDING 
Avaya Phone System Support & Maintenance
Automotive CMMS
International Refuse & Disposal Services
Canopy Improvements - CANCELLED
Airport Operations & Maintenance Uniforms
Odor Control Vessel Replacement
Glycol Storage Tank Cleaning
Self-Contained Breathing Apparatus
HVAC Air Filters
Janitorial Products
Caustic Soda 50%
ARFF Foam Testing Equipment
Structural Protective Turnout Gear
Short Term Lease for One ARFF Vehicle
Rapiscan systems 626XR X-RAY Screening System Contract
ARFF Ancillary Equipment
HP Storevirtual 4730 SAN Support - No Bids
FAA Approved Runway Sand
Police Winter/Summer Uniforms & Accessories
Potassium Acetate Deicing Liquid
Endpoint Protection Solution
ARFF Ancillary Equipment
Avaya Phone System Support & Maintenance
HPE Network Switches
Apron Rehabilitation - Quonset Airport
International Waste
Pavement Marking Paint and Glass Beads
ARFF Vehicle
Fortinet Firewalls and WAP Replacements
Veeam Backup Renewal
Airport inspection and Work Order Management Software
Designated Aviation Channeling Services
Advertising Digital Displays
Electric Golf Cars
Reupholster Terminal Seating     
Snow Removal Services - Surface Lots D & E & SFZ/OQU
Carbon Media - Odor Control System
Landscape Services



If you have any questions or would like more information on a particular posting or the Procurement process, CLICK HERE to e-mail the Procurement team.

`